Account schedule tags replace schedule tags for accounts and plans.
Account schedule tags can be used to modify how schedules are executed for accounts or plans. These can be useful for:
Testing schedules on an account or plan
Performing migrations from a previous banking system to Vault
For example, accounts can be loaded from a previous system with the schedules skipped. When all accounts have been migrated, all schedules can be enabled in Vault and the schedules in the previous system can be disabled.